Projects
Case Study #24
Bruce Highway Caboolture to Steve Irwin Way Upgrade Project, QLD
Client:
Scope:
Seismic investigation to assist in the characterisation of rock along the Bruce Hwy and below the bridges (4).
Due to the working restrictions on the Bruce Hwy, work was carried out at night using special seismic cables capable to be deployed on land and under water. Due to the time restrictions, land, marine and down-hole seismic were carried out simultaneously.
Methodologies: